Quixxsmart Kits
Much of the appeal of Quixxsmart Structures is the “Do it Yourself” Design capability for those who would like to begin a number of projects but don’t know where to begin. The Quixxstart selections represent two levels of kits to help your team on the way to designing and building efficient structures, carts, racks, stations and flow racks. Fittings are complete with fasteners.
Quixxsmart Level 1 | Quixxsmart Level 2 | Part Number | Description |
---|---|---|---|
Fittings | |||
250 | 150 | QC-1 | Tee Fitting w/Hardware |
100 | 50 | QC-2 | Elbow Fitting w/Hardware |
100 | 50 | QC-3 | 4 Way Fitting w/Hardware |
100 | 50 | QC-4 | 3 Way Fitting w/Hardware |
100 | 50 | QC-6 | Offset Fitting w/Hardware |
100 | 50 | QC-7 | Pivot Tee Fitting w/Hardware |
50 | 25 | QC-10 | Tee Hinge Fitting w/Hardware |
50 | 25 | QC-11 | Parallel Fitting w/Hardware |
100 | 50 | QC-13 | Universal Fitting w/ Hardware |
150 | 75 | QECI | End Caps |
Roller Track and Mounting HardwareÝ | |||
100 | 50 | QF | Mounting Bracket Flow |
100 | 50 | QDS | Mounting Bracket Drop Stop |
100 | 50 | QS | Mounting Bracket Stop |
50 | 25 | A3MS | Aluminum Standard Roller Track |
24 | 12 | QSP: | Roller Track Splicer (Pair) |
Caster and Hardware | |||
120 | 60 | QF1000Q | Upper Caster Strap |
120 | 60 | QF1002Q | Lower Caster Strap |
240 | 120 | HHCS40 | Hex Head Cap Screw |
24 | 12 | 74885 | 5″ Total Lock Swivel Plate Caster |
24 | 12 | 79886 | 5″ Fixed Plate Caster |
24 | 12 | 79885 | 5″ Swivel Plate Caster |
24 | 12 | QLVI | 3/8″ Leveler |
24 | 12 | QTBI | 3/8″ Threaded Bushing |
Tubing Select from the following types of tubing. | |||
100 | 50 | QJ-12 | 12′ Stell Zinc Tubing |
100 | 50 | QP4M( ) | 4 Meter Plastic Jacket Steel Tubing (blue, white, ivory, black, yellow or bronze) |
100 | 50 | QJ12PC | 12′ Steel Zinc Tubing Powder Coated (blue, white, ivory, black, yellow or bronze) |
Testimonials
What Our Customers Say
“I want truly to thank everyone in the Quixxsmart team that worked on this project. After 14 years in business and each year growing this was the first that I was at ease prior to the rush. What a difference.”
Roger
Floor Manager